Handing over the keys
  1. Home
  2. The journey to the keys

The journey to the keys

Seven steps from idea to keys

Building a home shouldn't mean coordinating ten contractors. From the first conversation to moving in, one team walks with you, and at every step you know what is happening, how long it takes and what you get.

Visualisation

How we work

The path to the keys

The whole journey takes about 9–14 months

  1. 01

    Questionnaire and call

    You fill in a two-minute questionnaire. We meet in person or online to understand how you want to live: how many people, what size of dome, your budget and your timing.

    Duration
    1–2 weeks
    You receive
    A summary of your needs and an indicative price

    What you do

    • Fill in the two-minute questionnaire
    • Tell us how you want to live and your budget

    What we do

    • Meet you in person or online
    • Prepare a summary of your needs and an indicative price
    Questionnaire and call
  2. 02

    Plot and surveyor

    We check the plot's zoning, what can be built, access and utilities. A surveyor prepares the topographic survey. If you don't have a plot yet, we help you find one.

    Duration
    2–4 weeks
    You receive
    Topographic survey and a plot feasibility note

    What you do

    • Show us your plot or the options you are considering
    • Share the plot documents you have

    What we do

    • Assess permitted use, restrictions, access and utilities
    • Have the surveyor prepare a topographic survey
    • Help you find a plot if you don't have one yet
    Plot and surveyor
  3. 03

    Design

    The architect designs the layout around your family and places the structure and windows for sun and views. Together we agree the interior and the estimate.

    Duration
    1–2 months
    You receive
    Design, visualisations and a detailed estimate

    What you do

    • Discuss the layout, windows and interior with the architect
    • Choose a finish level

    What we do

    • Create the layout and visualisations
    • Prepare an exact estimate
    Design
  4. 04

    Permits

    We prepare the design documents, obtain utility connection terms and the building permit. You don't need to visit any offices.

    Duration
    1–3 months
    You receive
    Building permit

    What you do

    • Sign the necessary applications
    • No need to visit any offices

    What we do

    • Prepare the design documents
    • Obtain the utility connection terms and the building permit
    Permits
  5. 05

    Foundation and frame

    We lay the foundation and utility connections. Prefabricated frame elements are assembled within a few weeks.

    Duration
    1–2 months
    You receive
    The dome frame standing on site

    What you do

    • Watch your home rise

    What we do

    • Lay the foundations and utility inlets
    • Make and assemble the geodesic frame
    Foundation and frame
  6. 06

    Reed shell and finishing

    Master thatchers lay the reed by hand while the interior team installs heating, ventilation, electrics and finishes.

    Duration
    3–5 months
    You receive
    A finished A++ home

    What you do

    • Finalise the interior details

    What we do

    • Thatchers lay the reed by hand
    • Install heating, ventilation, electrics and finishes
    Reed shell and finishing
  7. 07

    Keys

    We walk through the house together and hand over documents, warranties and a care guide. You move in, and we stay within reach.

    Duration
    1 day
    You receive
    Keys, documents and warranty

    What you do

    • Walk through the home with us
    • Move in

    What we do

    • Hand over documents, warranties and the care guide
    • Stay reachable after you move in
    Keys

What the journey to the keys includes

  • Consultation and a summary of your needs
  • Plot assessment and topographic survey
  • Architect's design, visualisations and cost estimate
  • Building permit and utility connection terms
  • Foundations, utility inlets and frame
  • Hand-laid reed thatch
  • Heating, ventilation, electrics and interior finishes
  • Handover with documents, warranties and a care guide

The journey to the keys

What we will need from you

  • 01The plot documents, or the plot you are considering
  • 02Your wishes: how many rooms, what windows, what interior
  • 03Timely decisions, especially during design
  • 04Your time for conversations – we do the rest

Questions

Questions about the journey

How long does the whole journey take?

About 9–14 months. Permits and finishing take longest, so we include a preliminary schedule with the proposal.

I don't have a plot. Where do I start?

With the questionnaire and a conversation. We help you assess plots and check whether a dome home can be built on them.

Can I change decisions during construction?

Most decisions are agreed during design. Later changes are discussed separately so you know their cost and effect on the schedule.